Airgunspares.com is a live website, all items displayed as "In Stock" are physically available.
Airgunspares.com is a live website, all items displayed as "In Stock" are physically available.

Böker Magnum Long Lead EDC

Böker Magnum Long Lead EDC

£19.95
In stock
SKU
788857750346

You must be 18+ years of age to purchase this product

As part of the 2006 Violent Crime Reduction Act it is now an offence to sell a knife, Knife making materials or Edge tools to persons under the age of 18 years. If you are purchasing this product, please state your date of birth to confirm that you are over 18 years of age and comply with the Offensive Weapons Act of 1996.

Scroll down for product information and specifications.

With its simple, slightly curved design and non-locking satin finished 8Cr13MoV stainless steel blade, the Böker Magnum Long Lead EDC offers a classic pocket knife design. The handle scales are made from a lightly textured G10 that fits perfectly into the hand. To make sure that this knife is always to hand, a pocket clip has been fixed to the back.

Blade Size 3.14″ / 8cm
Overall Length 7.24″ / 18.4cm
Blade Material 8Cr13Mov   Stainless Steel
Handle Material Black G10
Locking Mechanism Slip Joint
Accessories Belt Clip
Washable Hand Wash

 

 
More Information
Product NameBöker Magnum Long Lead EDC

RETURNS

Should you not be satisfied with goods correctly received, please ensure you return them within 10 days from the date of delivery. Provided goods are returned to us in their original condition, packaging, and with all labels still attached, we will refund the cost of the goods, minus a 20% restocking charge. The cost of postage will not be included unless good are received faulty, in which case we will issue a replacement, we will also refund the cost of postage.

DAMAGED GOODS OR GOODS LOST IN TRANSIT

When selecting our ‘Unrecorded Delivery At Buyer's Risk’, it means just that – the onus for non-delivery is held firmly with the buyer as John Knibbs International Ltd have no way of tracking or tracing the items once they have been collected from our premises. If this method of shipping is selected by the buyer, John Knibbs International Ltd will not be held responsible for any loss, damage or non-delivery of the purchased items.

It is ALWAYS safer to select the recorded delivery option for shipping to guarantee delivery of goods.

Please examine all packages prior to receipt as signatures are taken as proof of receipt in good condition. All damaged packages MUST be either refused or signed RECEIVED DAMAGED and in either case we must be advised of damage goods within three days of delivery.

CANCELLATION AND ALTERATION OF ORDERS

Orders may be cancelled or altered prior to despatch only. Once an order has been processed, goods must be cancelled/returned as per our Returns Policy.

Any work undertaken as a ‘special order’ cannot be cancelled or returned once work has commenced or order has been despatched.

Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account

PLEASE READ CAREFULLY BEFORE CONTINUING


This item can only be sold within the United Kingdom and must be either collected in store or delivered to a Registered Firearms Dealer.

We CANNOT deliver this item directly to you.

Upon checkout, please enter your nominated dealer's details into the delivery address section. Please be aware, additional charges may be incurred on the receiving dealer's end.

You must then send your Shotguns / Firearms license to us so that we can fill in all the necessary information. Your license will be sent back to you directly, and the firearms will be shipped to your nominated RFD.
  

If you enter an incorrect shipping address, a £2.50 administration fee will apply upon refund to rectify the error.

By clicking Continue you confirm that you understand and agree to these terms & conditions.

Cancel
Continue

PLEASE BE READ CAREFULLY BEFORE CONTINUING
 

Shipping Within the United Kingdom:

This item can only be sent to a Registered Firearms Dealer

YOU MUST ENTER YOUR NOMINATED RFD'S ADDRESS UPON CHECKOUT.

DO NOT ORDER UNLESS YOU DO THIS or intend to collect in person from our shop.

If you enter an incorrect shipping address, a £2.50 administration fee will apply upon refund to rectify the error.

For Pistons:

We can only send pistons to you direct if you first send the old part to us for exchange.

If you are sending the old part please make a note of this in the ‘Comments’ section of your order. 

The original item MUST be sent to us by recorded delivery.

If you do not have the old part or do not want to send it to us then the order will have to be sent to a Registered Firearms Dealer with whom you MUST make arrangements to accept this part on your behalf.

Shipping Outside the United Kingdom:

This item can be shipped outside the United Kingdom and can be delivered to you direct.

By clicking Continue you confirm that you understand & agree to these Terms & Conditions

Cancel
Continue

YOU MUST BE 18+ TO PURCHASE THIS PRODUCT

As part of the 2006 Violent Crime Reduction Act it is now an offence to sell a knife, Knife making materials or Edge tools to persons under the age of 18 years.

If you are purchasing this product, please confirm that you are over 18 years of age and comply with the Offensive Weapons Act of 1996.


By clicking continue you confirm you are over 18 years of age.

Cancel
Continue

PLEASE READ CAREFULLY BEFORE CONTINUING


This item can only be sold within the United Kingdom and must be either collected in store or delivered to a Registered Firearms Dealer.

We CANNOT deliver this item directly to you.

Upon checkout, please enter your nominated dealer's details into the delivery address section. 

You must then send your Shotguns / Firearms license to us so that we can fill in all the necessary information. Your license will be sent back to you directly, and the firearms will be shipped to your nominated RFD.
  

If you enter an incorrect shipping address, a £2.50 administration fee will apply upon refund to rectify the error.

By clicking Continue you confirm that you understand and agree to these terms & conditions.

Cancel
Continue

PLEASE BE AWARE:

Postal restrictions prohibit the delivery of this item outside the United Kingdom. 

Please do not order if you wish for this item to be sent abroad, as we will not be able to do so.

No refunds for prohibited items will be made.

By clicking continue, you acknowledge that you understand and accept these terms and conditions.

 

Cancel
Continue

PLEASE BE AWARE:

Due to postal restrictions this item can only be delivered within the United Kingdom.

Please DO NOT attempt to have this item delivered abroad, as we will not be able to honour the order.

If you are outside the UK, please click Cancel. 

 

Cancel
Continue

PLEASE NOTE

All our gauges are tested by us before shipping, be aware that we do not accept any returns on this item due to having them swapped by customers in the past and returned for refund.

By clicking continue, you agree that we offer no returns/refunds.

 

Cancel
Continue

 

CLICK & COLLECT ONLY

Please be aware that this item is only available via Click & Collect due to postal restrictions. 

By clicking Continue you confirm that you understand and will collect this item from our retail premises. 

 

Cancel
Continue

 

UK DELIVERY:

Please be aware that this item can only be sent to a Registered Firearms Dealer.

When ordering, you MUST enter the Registered Firearms Dealers address details as the 'SHIPPING ADDRESS' at checkout.

DO NOT ORDER UNLESS YOU DO THIS or intend to collect in person from our shop, as we will not be able to process this order.

 

OVERSEAS DELIVERY:

We can ship this item outside the UK directly to you.

 

By clicking 'Continue' you confirm you understand these Terms & Conditions.

 

Cancel
Continue

PLEASE NOTE FOR UK DELIVERY:

We can ship this barrel directly to non RFDs within the UK as a barrel blank only, the barrel would be cut, removing the transfer port section. If you order within the UK and & do not select a dealers delivery address the barrel WILL be cut so it can be shipped and will arrive as such. This is non-returnable and non-refundable.

By clicking Continue, you agree to these Terms & Conditions

Cancel
Continue